Elite Construction Services Inc.
Condo Remodel
General Remodel including 2 Bathrooms where we installed new tile and plumbing fixtures. The old kitchen cabinetry was demoed out along with the Fluorescent fixtures in the middle of the room. New tile was installed along with new Maple clear finish cabinetry and Quartz countertop. Backsplash was finished out with Tumbled Travertine tiles on a 45 degree angle. Lastly, rope lighting was installed into the old Fluorescent fixture popup in the drywall and trimmed out with 3-1/2 crown molding.

Copyright 2010